Designed to standard. Documented for inspection.
The international standards we design to, the approvals we plan for and the quality controls we apply on every project.
Standards we design and test to
Applied where relevant to the project and the selected equipment.
Structured cabling
ANSI/TIA-568, ISO/IEC 11801, TIA-606 labelling
Power over Ethernet
IEEE 802.3af / at / bt
Wireless
IEEE 802.11ax / be, 802.1X authentication
Voice alarm
EN 54-16 control equipment, EN 54-24 loudspeakers, EN 54-4 power supplies
Speech intelligibility
IEC 60268-16 (STI)
Building automation
BACnet (ISO 16484-5), Modbus, KNX (ISO/IEC 14543), DALI (IEC 62386)
Video surveillance
ONVIF profiles, IEC 62676 series
Access control
OSDP for secure reader communication
Authority requirements we plan for
Applicable requirements depend on the emirate, building type and system. We confirm them at the start of every project.
Civil Defence
Fire and life-safety interfaces, including voice evacuation, are designed and tested for inspection by the relevant Civil Defence authority.
Security approvals
CCTV and security system designs prepared for the security regulator that applies to the emirate and facility type.
Telecommunications
In-building telecom and wireless infrastructure designed with regard to TDRA requirements where applicable.
Data protection
Surveillance, biometrics and visitor data handled with regard to the UAE Personal Data Protection Law and client policies.
Certifications and registrations
Quality, safety and environmental management certifications, trade licence and authority registrations.
Quality management
Current certificate and registration details are available on request.
Health & safety
Current certificate and registration details are available on request.
Authority registrations
Approved contractor listings and registrations relevant to our disciplines.
How we control quality.
- Approved material submittals before procurement
- Inspection and test plans for every system
- Work inspection requests at each installation stage
- Cabling certification for every link
- Factory and site acceptance testing
- Cause-and-effect testing witnessed by the consultant
- Snag lists closed and signed before handover
- Documented configurations and password handover
Planning a project? Start with a site survey.
Tell us about your building and the systems you need. An engineer will visit, review your drawings and come back with a clear scope, a design approach and a budget estimate.
